WhatsApp

BPS Global
Customer Support

BPS Global
客戶支持

BPS Global
客户支持

Hello! How can we help you today?

您好!今天有什么我们可以帮助您的吗?

您好!今天有什麼我們可以幫助您的嗎?

Now
現在

I'd like to know more about your services

我想了解更多关于你们的服务

我想了解更多關於你們的服務

Now
現在
Proposed A&A for Conversion of an Entire Industrial Building at 107 How Ming Street Kwun Tong

Overview

Revitalization of old industrial building at No. 107 of How Ming Street into 10 story levels in which carried out upgrade the E&M system to suitable for new layout plan and design.

 

Project Summary

  • To provide electrical distribution system with emergency generator set for new layout plan & design;
  • To provide and install new MVAC and ventilation system to suitable for new layout plan and design;
  • To provide and install the GAS supply system from G/F to 4/F to suitable for new layout plan and design;
  • To replace existing the lifts and supply & install new lifts and provide install new escalators from G/F to 3/F;
  • Replace existing fresh/flush water pipes & fittings and provide & fix new fresh/flush water supply systems to suitable for new layout plan and design;
  • Replacement for sanitary fittings, drainage pipe and CCTV system into 1/F to 9/F for new layout plan & design.

 

Project Timeline

Aug 2015 – Dec 2016

 

Customer Benefits

  • Aims to provide more floor space for suitable uses to meet Hong Kong’s changing social and economic needs.
  • Industrial buildings usually have high ceiling height, high floor-loading, flexible floor layouts, thus have good potential for conversion to serve other uses.
  • Compared with redevelopment, conversion will generate less construction wastes, can start and complete within a shorter time and lower construction cost.

Project Details

 

Scope of Work

  • Alterations & Additions
  • Fitting Out
  • Building Services

 

Location

  • Hong Kong
RELATED PROJECTS